Background

◼ Intuitive monitoring for complex, large-scale sites
◼ Accurate settlement data beyond the limits of 2D drawings
◼ Unified platform for company-wide communication

Use Cases

◼ Clash Resolution: Overlaying site photos and CAD drawings
◼ Volume Calculation: Measuring exact concrete pouring quantities
◼ Proactive Review: Comparing 3D models with drone site data

Introduction Effect

◼ Time Saved: Maximized efficiency with faster site inspections
◼ Transparency: Prevented disputes with objective settlement data
◼ Enhanced Safety: Better safety management and team communication

“With Meissa, Lotte E&C coordinates today's complex workflows and previews tomorrow's completed complexes.”

On large-scale, complex residential sites with significant elevation differences, accurate tracking and workflow coordination determine project success. Lotte E&C adopted Meissa to overcome the limitations of 2D drawings, streamline subcontractor cost settlements, and efficiently manage everything from safety to site control.

Check out our interview from Lotte E&C's Incheon Hyoseong District Residential 4BL site to see how Meissa became a vital tool for team communication and site management.

Seamless Communication on a Unified Platform

Q. Could you briefly introduce your site?

💬 Park Gyu-young, Site Manager
"Hello, I am Park Gyu-young, the Site Manager for the Incheon Hyoseong District Residential 4BL project. We began in September 2024 and are now entering the final stages of construction.

When I took over this site in 2024, my biggest challenge was finding a smart way to monitor a complex project at a glance. After hearing about the success of using Meissa at our Cheonan site, I worked with our R&D institute to implement it here.

We started using the platform during the initial excavation phase. It was incredibly useful for pinpointing earth retention and earth anchor locations by interacting with the 3D models. Experiencing that practical value early on is why we still rely heavily on Meissa today for site monitoring and subcontractor coordination as we wrap up construction."

Q. It is impressive that the entire site team, not just a few managers, uses Meissa. How did that start?

💬 Mr. Park Gyu-young (Site Manager)
To be honest, I had some reservations at first. While the technology is great, I worried that exposing every corner of the site might feel like micromanagement or put pressure on the staff.

However, we pushed forward because I knew the benefits of having clear records would far outweigh those concerns. When issues like cost settlements arise with subcontractors, our team can confidently and smoothly handle the process backed by objective data.

Initially, I had to encourage its use, but now the team takes the initiative. When I log into the platform, I see they are actively applying Meissa to various tasks completely on their own.

💬 Mr. Oh Min-kyun (Safety Team)
I believe the Site Manager strongly recommended platforms like Meissa because it ultimately saves working hours for the field staff. We can intuitively and quickly estimate quantities and distances directly on the screen, bypassing tedious drawing work.

Its use isn't limited to the construction team. As a safety manager, I’ve used Meissa during morning briefings to pinpoint locations for high-risk workers. Our MEP (Mechanical) and administrative teams are using it as well. Familiarizing everyone with this tool opens up endless possibilities to improve the overall construction process.

💬 Mr. Kim Tae-hoon (Construction Team)
Every employee on our site knows how to use Meissa. We typically update the site data every two weeks. It truly serves as a unified communication hub where everyone can easily check how the site is progressing.

Resolving Current Workflows, Shaping the Future

Q. How are you using Meissa for workflow coordination and task delegation on such a complex, multi-level site?

💬 Mr. Kim Tae-hoon (Construction Team)
Because our site has significant elevation differences, work sequences can easily get tangled. It used to be a struggle to explain this verbally, but now we pull up Meissa on a tablet during subcontractor meetings.

We coordinate intuitively by looking at the screen: 'This is the pump car area, and that’s the crane radius, so let’s split the work into AM and PM to avoid clashes,' or 'Waterproofing starts here, so please clear the materials.' We even measure pouring distances directly on the platform to check equipment reach before finalizing our plans.

💬 Mr. Pyo Han-bin (Construction Team)
Similarly, I use it for task delegation. I can't memorize every location for safety fences or zoning nets, so I quickly check Meissa from the office.

For example, if a safety fence needs to be dismantled to move materials, I just take a screenshot from Meissa and point out the exact section. I could walk out to the site and take a photo myself, but this method drastically cuts down on physical travel time and ensures immediate understanding.

Q. It seems you have overlaid various drawings on Meissa. How exactly were these blueprints utilized in practice?

💬 Mr. Park Gyu-young (Site Manager)
The design overlay feature is exceptionally useful. We relied on it heavily to verify the positioning of temporary structures, underground facilities, precast concrete (PC), and basement columns.

It was particularly valuable during PHC piling work, as it displays exact pile locations. If we notice any deviation on the screen, we can immediately call the subcontractor to address the issue. Doing this manually on-site is incredibly labor-intensive, but being able to check it instantly from the office has been a massive help for construction management.

💬 Mr. Kim Tae-hoon (Construction Team)
To add to the Site Manager's point, when we overlaid the pile blueprints onto the drone maps, any misplaced piles stood out immediately. When we went out to verify with our surveying equipment, they were indeed off-limits, allowing us to make urgent corrections right away.

💬 Mr. Park Jung-hoon (Mechanical Team)
For my role, rather than just viewing the drawings, I used them as a reference to measure the lengths of drainage pumps and temporary piping that extended beyond the site boundary.

Design drawings only cover the interior of the construction site. Pipes or pumps that need to route outside the boundary aren't detailed, making it hard to estimate their lengths. By overlaying the stormwater drainage layout onto the orthomosaic photos, I could map out the actual pipeline path on screen before ordering materials. This allowed me to estimate the required lengths beforehand and ensure we had enough supply for installation.

Q. It is interesting that you upload not only the current site status but also a 3D mock-up of the completed complex. What is the reason behind this?

💬 Mr. Park Gyu-young (Site Manager)
Physical mock-ups are usually bulky and take up too much space in a temporary site office. However, digitizing the mock-up into a 3D model and uploading it to the platform has made our weekly meetings incredibly convenient.

We use Meissa's site mapping to track the 'present' progress, while referencing the 3D model to visualize the 'future' outcome. It allows us to hold proactive planning meetings by rotating the complex in real-time to answer questions like, 'How is the layout of this road designed?' or 'What is the planned elevation for the landscaping stones and internal site differences?'—details that are often hard to grasp from 2D flat drawings alone.

Initially, we uploaded it to keep a solid record in case of future civil complaints regarding discrepancies from the model house post-completion. But in practice, the greatest advantage is being able to see both the beginning and the end of the project within a single platform. Honestly, I didn't expect it to be this versatile when we first started, but it has proven to be exceptionally useful.

Proving Site Data with Numbers: Beyond the Blueprints

Q. Did you also use Meissa to calculate material quantities during earthworks or structural framework construction?

💬 Mr. Park Gyu-young (Site Manager)
Yes, we utilized it for interim cost settlements with our subcontractors. Knowing the total volume isn't enough; we need to analyze the data by specific soil properties.

By capturing drone data every time the soil strata changed, we obtained highly accurate values and finalized our settlements based on those figures. Having this clear, objective evidence pleased the headquarters team as well. It made me realize that this platform could significantly reduce chronic settlement disputes.

💬 Mr. Kim Tae-hoon (Construction Team)
Its usability goes beyond earthworks; it’s highly effective for foundation concrete pouring as well. Excavations never turn out as perfectly as the drawings suggest; over-excavation is inevitable. In the past, we had to either redraw the plans to account for this or add a premium to calculate the correct quantities.

With Meissa, even for irregular surface areas like leveling concrete or weight concrete, we can simply use the area measurement tool to get an immediate estimate when we are in a rush. It is a massive help for grasping the actual required materials. When we later compared our estimates to the actual poured volume, the calculated margin of error was remarkably precise.

💬 Mr. Pyo Han-bin (Construction Team)
To add to the concrete pouring scenario, things can move incredibly fast on site. When the final deadline for ready-mix concrete approaches, there is no time to run back to the office to check drawings. Dispatch usually ends at 5 PM. I vividly remember using Meissa right in the field with time running out—checking required volumes by section in real-time to quickly determine the exact order quantity.

Lotte E&C and Meissa: Shaping the Future of Smart Construction

Q. Do you plan to continue using Meissa on future projects?

💬 Mr. Park Gyu-young (Site Manager)
Whenever external inspectors or VIPs visit, I always bring up the Meissa platform to guide the discussion. We use it extensively in meetings to overlay drawings or proactively review 3D models for site elevations, roads, and landscaping that are hard to grasp in 2D. It has also been a massive help in reducing settlement disputes.

Honestly, I didn’t expect a single platform to cover this much ground. I am very grateful for how it enables transparent site management. I heard the 3D viewer is getting an update soon, and I look forward to utilizing it even more effectively on our next project.

💬 Mr. Oh Min-kyun (Safety Team)
From a safety manager’s perspective, one of Meissa’s biggest advantages is the ability to overlay blueprints directly onto panoramic site photos. It allows us to verify if actual construction matches the drawings on a single screen. In the past, we had to roughly estimate working radiuses on outdated drone photos for our reports, which compromised reliability. But Meissa’s distance values are based on actual measurements, meaning we can accurately mark working radiuses and directly embed them into our safety plans.

There are still some hurdles to fully integrating tech-based safety on site. With a daily workforce of 500, securing GPS consent and training each worker in their 40s and 50s isn't easy, and we must also consider the costs associated with such a large workforce. However, I know Meissa is continuously updating its features. Once functions like location-based hazard alerts are fully adopted, I expect it will deliver substantial value for worker safety management

고층 아파트 단지와 주변 도로, 주차장이 보이는 도시 항공 뷰.
Use case

Construction Client Case Studies

How Are Meissa's Existing Customers Getting Started with Smart Construction?
Explore Through Meissa Platform Customer Cases.

LOTTE E&C Residential Complex Construction Site

“With Meissa, Lotte E&C coordinates today's complex workflows and previews tomorrow's completed complexes.”

Incheon Hyoseong District Residential 4BL site
Learn More
회의 중인 두 남성, 회색 작업 조끼를 입고 책상에 앉아 있다.
동부건설 스포츠 시설 현장 도입 사례

“동부건설은 메이사를 통해 현장 관리의 실시간화를 이루었습니다.”

동부건설 천안축구종합센터 현장
자세히 보기
안경을 쓴 두 남성이 밝은 실내에서 카메라를 응시하고 있다.
Obayashi Corporation DX Adoption Case Study

“Obayashi Corporation uses Meissa to visualize sites and manage progress and earthwork volumes.”

Next-Generation Technology Development Section, Obayashi Corporation
Learn More
책상 앞에 앉아 이야기하는 갈색 카디건을 입은 남성.
Daewoo Engineering & Construction Apartment Project Case Study

“Daewoo Construction records the site in detail and improves operational efficiency through Meissa.”

Daewoo Construction Yeongtong Prugio Apartment Complex 1 and 2 Construction Site
Learn More
HDC 현산업개발 로고가 있는 조끼를 입은 남성이 사무실에서 대화하며 손 제스처를 하는 모습.
HDC Hyundai Development Company Apartment Project Case Study

“HDC Hyundai Development Company uses Meissa to reduce process overlap and boost on-site efficiency.”

HDC Hyundai Development Company Residential Construction Site
Learn More
안경을 쓴 남성이 업무복을 입고 사무실에서 노트북을 보고 있다.
Xi C&A Production Facility Case Study

"At Xi C&A, we manage multi-channel data integrally with Meissa."

Xi C&A Ochang Energy Plant 2 Battery Production Building 2 Site
Learn More
안경을 쓴 남성이 회의실에서 진지하게 이야기하고 있다.
KCC Engineering & Construction Civil Works Case Study

"KCC Construction has optimized civil site management with Meissa."

KCC Construction Sejong-Anseong Expressway Section 5 Site
회의 중 손을 펼쳐 설명하는 남성.
DL E&C Company-Wide Meissa Platform Adoption Case Study

"After adopting the Meissa Platform, we easily manage risks across all sites."

DL E&C Convergence Technology Team
Icon - Elements Webflow Library - BRIX Templates
Icon - Elements Webflow Library - BRIX Templates

Smart Construction Made Easy! Request a Meissa Demo.